+86 315 5788 869rolls@tspengbai.com
Home > News
>

Process flow of butt welding process for pipe welding machine

Apr. 18, 2023

The specific welding process flow is:


1.After the plate coil is properly positioned, the left and right cone heads of the uncoiler can be inserted into the steel coil and rotated simultaneously, delivering the head to the clamping roller. The upper roller of the clamping roller presses down, and the steel coil trolley and magnetic roller can return to their original position.


2. In order to ensure accurate centering of the spring steel strip, the uncoiler can move axially as a whole by+150mm before operation. After starting the uncoiler, the strip steel reaches the straightening machine equipped with a dust removal device through the pinch roller.


3. The straightened spring steel strip is cut at the head and tail using a sliding hydraulic shear (the cut strip steel head can immediately slide into the waste bin, and the cut strip steel tail can be collected into a dedicated aggregate box on the outer side of the line using an output device).


back to news
Share
Latest News:
Top